Phase 1:

The first phase of the project

involved:

bullet

 moving the image of the Lamb of God from the Sacred Heart altar

bullet

to the main altar.

This was completed  Christmas of 2008.

 

 

 

 

 

 

 

This is the Present state of
   the Sacred Heart altar.

Previously the Lamb of God
   filled in the whole lower part
   of the altar and overlaid
   the Rose design you see now.
   (Christmas 2008)

 

The image of the Lamb of God in fills the space in between the legs of the Main altar.

Phase 2:

The second phase of the project

involved:

bullet

Shortening some of the back pews to make room for the Baptismal Font / Fountain.

bullet

Doing some electrical and pluming work.

bullet

Placing the old Baptismal Font in place.

bullet

Adding the Baptismal Pool and mosaic.

This has been completed (Easter 2009).

bullet

Tile floor around Baptismal Font (Dec. 2009)

 

The Baptismal Font
Pool and
Pascal Candle
is located in the center aisle
at  the rear of the Cathedral
(Front Entrance)

 

Phase 3:

The Third phase of the project

involves:

bullet

relocation of the tabernacle

bullet

placement of the sacramental oils (done) &

bullet

upgrade to cathedra - bishop's chair

 

The Relocation
of
The Tabernacle
to its new location
behind the Main Altar


 

The placement of the Sacred Oils
is in the rear of the Cathedral
was completed ahead of time.
(Easter 2009)

 


Bishop's Coat of Arms

The upgrade
of
The Cathedra
was  completed.
Dec. 2009
 

Phase 3(a):

The last phase of the project

involves:

 

The Relocation
of
statues of
Mary, St. Joseph,

St. Francis and
St. Anthony
to
the Baptistry

was completed
Jan. 2010